November 22, 2018

What Work is Taking Place? 

A new traffic configuration will be implemented at Forest Hill Station this month.  Construction will shift to the north side of Eglinton Avenue, and traffic will shift to the south.  Peveril Hill Road will remain closed to accommodate the construction laydown area.  This change is required to make way for the next phase of construction at Forest Hill Station.

Once the traffic change is complete, crews will begin support of excavation in the north station box area.  Support of excavation, also known as shoring, is a common step in constructing the foundation of a building. Piles are drilled, large steel beams are installed, and concrete is poured.  Following that, a shallow area is excavated while lagging, braces and tie-backs are installed.  Excavation at the Secondary Entrance as well as utilities relocation will continue while this work takes place.

Hours of Work

  • Traffic changes will be implemented as early as Friday November 23, 2018 between 8 p.m. and 2 a.m.
  • Support of excavation activities will take place between 7 a.m. – 11 p.m., Monday through Sunday
  • Overnight utilities work will continue through December 2018
  • Work may be delayed due to weather conditions or unforeseen circumstances.

What to Expect

  • Noise from construction activity, including a drill, crane, loaders, trucks and other construction equipment, as well as dust from drilling activity and debris removal
  • Heavy truck traffic entering and exiting the work zone
  • Vibration from drilling activity
  • Equipment and material storage within designated work zones.
  • Access to all businesses will be maintained.

Traffic Details

  • Traffic on Eglinton Ave will be shifted to the south
  • Traffic on Bathurst St will remain on the west
  • Peveril Hill Rd N will remain closed at Eglinton Ave
  • Northbound right turn from Bathurst St to Eglinton Ave will be permitted

Pedestrian Details

  • The east crosswalk at Bathurst St and Eglinton Ave will be closed during this stage

 